Important Message from IPS
Monday, 20th February 2023
Categories:
In the News
At IPS we pride ourselves on being able to provide our customers with the very best service each and every day.
We will be integrasted a new operating system at the end of February, here are some key dates to be aware of in order to minimise the disruption to you.
Dates to Remember
- Monday 27th February – Open for Orders & Shipments as Normal
- Monday 27th February 5pm Closed for Month End Procedures
- Tuesday 28th February Closed for Orders – Data Migration
- Wednesday 1st March Closed Orders – Data Migration
- Thursday 2nd March Open as Usual
Please bear these dates in mind in considering your material requirements during week commencing 27th February.
We will endeavour to keep any disruption to the absolute minimum and will remind you nearer the time of these dates again.
Thank you for your understanding during this transition.
Categories
Archive
Tags
kessel
ips flow systems
agru
backwater protection
drainage
exhibition
rm pressfit
ips
blazemaster
pvdf
spears manufacturing
ips dublin
cpvc fire protection
flameguard
drainage by design
construction week
polyethylene pipe
aqualift f
excel london
installation tools
uk construction week
nec
lifting station
floor drains
ecolift xl
aespres
pe100-rc
pumping station
aqualift f xxl
alzheimer's society
uk build 2018
building information management; bim
grease seperator
flood protection
fluid handling solutions
inoxpres
ecobuild
webinar
pvc
praher
demo van
staufix
business development manager
uk build
new staufix
polypropylene pipe
pump centre conference
fire suppression
mupro
drainage protection; staufix
Get In Touch
- sales@ipsflowsystems.com
- 0191 521 3111
- Seaham Grange Industrial Estate, Seaham, Durham, SR7 0PT,