Another quality Kessel drainage install

  • March 26, 2021

Kessel Installation

As part of the United Utilities HeFFeR scheme our service partner Bethell  Utilities installed two number Kessel EcoLift XL Hybrid Lifting Station's and an Aqualift F  pumping station to a property in Eccles. 

The property was prone to high frequency flooding and United Utilities needed preventative measures in place to prevent the basement being subjected to flooding through sewer surcharge.  

A standard lifting station must collect every litre of incoming wastewater and pump it into the sewer which is a constant use of valuable energy. The KESSEL Hybrid Lifting Stations function differently - they only activate when they are actually needed. This makes them much more ecological as well as economical - reducing energy and maintenance. The Pumpfix and Ecolift XL systems offer significant energy savings as well as reduce service and maintenance costs.

Blog Post

Related Articles

When your time is pressing - IPS come to you!

November 22, 2016
Let Us Come To You Today sees the new IPS demo vehicle starting a tour of the south east to raise awareness of one of...

IPS Flow Systems Announces New Trade Counter In Dublin

March 7, 2025
IPS Flow Systems Announces New Trade Counter In Dublin We’re excited to announce the opening of our brand-new Trade...

Visit to GPA Flowsystem AB in Sweden

November 13, 2014
Amazing Visit We spent a very productive couple of days last week with our sister company GPA Flowsystem AB in Hjarnarp...