FAQs

IPS
  • December 13, 2013

All Your Questions Answered

How long between ordering and dispatch?

For stock items: All orders placed before 4.30pm on weekdays will be dispatched the same day.
For non-stock items: Orders will be dispatched within 7 days.
For specially fabricated products: Orders will be dispatched within 14 days.

How long will delivery take?

Customers in most parts of the UK will revive their order within 24 hours. For More remote areas such as the Scottish Highlands, Islands, and Ireland delivery takes a little longer, if you live in one of these areas contact us for specific details.

How much is the delivery charge?

We charge £13.50 plus VAT for all standard deliveries, regardless of the size of the order.

Is next day delivery available?

We offer next day AM delivery at a charge of £19.50 plus VAT. For deliveries with specific requirements please contact our office.

Is VAT included in prices?

All of our prices exclude VAT.

What are your opening hours?

The office is open 8.30am until 5.00pm Monday to Friday.

Is training available?

We are happy to provide off-site or on-site training to customers. Please enquire for details.

How can I be assured of quality?

IPS Flow Systems has complete ISO9001:2008 accreditation and operates an environmental management system that is accredited to ISO14001. 

You will only every receive deliveries from IPS Flow Systems and never from third parties.

Our products are manufactured by world leading manufacturers who operate to UK, EU and International standards and to ISP9001 quality systems.

We've built a strong reputation for quality products and excellent customer service. 

What is your return policy?

If you are in anyway dissatisfied with our product, or have found on receipt that you have ordered incorrectly, call our customer service team within 7 days to arrange return and full refund for "as new" products. (This excludes custom-made, non-stock or specially ordered items.)
 
Blog Post

Related Articles

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

Hidden Risks in Data Centre Builds

September 18, 2025
Hidden Risks in Data Centre Builds, and How IPS Mitigates Them Data centres are the critical infrastructure powering...

Factory Mutual (FM) Approved Polyethylene Piping

December 16, 2013
FM Approved PE Factor Mutual (FM) Approval is a internationally acknowledged third-party certification which approves...

AGRU Plastic technology GmbH - HYDROCLICK system

January 19, 2021
AGRU HYDROCLICK LINING FOR POTABLE WATER TANKS Renovation of drinking water tanks In the Salzburg municipality of Zell...