IPS Blog
- IPS Flow Systems
- 2nd July 2026
Five Questions Every Engineer Should Ask Before Specifying a Valve or Sampling Point
Valve selection does not feel like a high-stakes decision until something fails. Then it feels very high-stakes indeed. Unplanned downtime costs UK manufacturers an average of £1.36 million per hour, according to a Censuswide survey published by Fluke in October 2025.
Recent Articles
- IPS Flow Systems
- July 2, 2026
Five Questions Every Engineer Should Ask Before Specifying a Valve or Sampling Point Valve selection does not feel like...
- IPS Flow Systems
- April 1, 2026
Why IPS built an e-commerce platform around how you work The IPS e-commerce platform is a web and app-based system that...
- Ashley Graven
- September 18, 2025
Hidden Risks in Data Centre Builds, and How IPS Mitigates Them Data centres are the critical infrastructure powering...
- Ashley Graven
- August 6, 2025
What Every Pool Installer Gets Wrong About Solvent Cementing Solvent cementing might look straightforward – apply the...
- Ashley Graven
- May 15, 2025
Navigating AMP8: What It Means for Plastic Piping in the Water Industry The UK water industry is entering a new phase...
- Ashley Graven
- May 8, 2025
Understanding UKIMS Compliance for Goods Imported from Northern Ireland to the Republic of Ireland As businesses in the...
- Ashley Graven
- April 17, 2025
Why Pipe Preparation Is the Hidden Key to Strong Socket Welds In the world of thermoplastic piping, achieving a strong,...
- Ashley Graven
- March 12, 2025
Last week, we had the pleasure of welcoming our Board to our headquarters in Seaham. The visit was a fantastic...
- IPS Flow Systems
- March 10, 2025
IPS Flow Systems at Futurebuild 2025: Driving Innovation in Sustainable Building Solutions Futurebuild 2025 was a...
- IPS Flow Systems
- March 7, 2025
IPS Flow Systems Announces New Trade Counter In Dublin We’re excited to announce the opening of our brand-new Trade...
