IPS Blog
- IPS Flow Systems
- 2nd July 2026
Five Questions Every Engineer Should Ask Before Specifying a Valve or Sampling Point
Valve selection does not feel like a high-stakes decision until something fails. Then it feels very high-stakes indeed. Unplanned downtime costs UK manufacturers an average of £1.36 million per hour, according to a Censuswide survey published by Fluke in October 2025.
Recent Articles
- IPS Flow Systems
- June 26, 2014
Well Done Guys! Congratulations to two IPS Flow System team members, Andrew Lamb and Paul Johnson who along with Morgan...
- IPS Flow Systems
- March 7, 2014
We Are Number 1 For the second time in 3 years (2011 being the first) IPS Flow Systems has been ranked as the Number 1...
- Lisa Moutter
- December 16, 2013
FM Approved PE Factor Mutual (FM) Approval is a internationally acknowledged third-party certification which approves...
- IPS Flow Systems
- December 13, 2013
All Your Questions Answered How long between ordering and dispatch? For stock items: All orders placed before 4.30pm on...
- IPS Flow Systems
- December 6, 2013
AgruAir Compressed air is used throughout industry as an economical source of clean energy. An leaks in a compressed...
- IPS Flow Systems
- November 29, 2013
PURAD Is an abbreviation of "pure advantage" and is the name given to the family of AGRU high purity thermoplastic...
- IPS Flow Systems
- November 27, 2013
Reduce Static Static builds up when two surfaces that are not electrically conductive rub together. In certain...
