IPS Blog
- IPS Flow Systems
- 2nd July 2026
Five Questions Every Engineer Should Ask Before Specifying a Valve or Sampling Point
Valve selection does not feel like a high-stakes decision until something fails. Then it feels very high-stakes indeed. Unplanned downtime costs UK manufacturers an average of £1.36 million per hour, according to a Censuswide survey published by Fluke in October 2025.
Recent Articles
- IPS Flow Systems
- December 7, 2016
WRAS Approved IPS Flow Systems are pleased to announce that the Praher M1 PVCu Ball Valve now has WRAS approval in both...
- IPS Flow Systems
- November 29, 2016
Aqualift F Basic The Kessel Aqualift F Basic lifting station will feature in the last of their successful webinars...
- IPS Flow Systems
- November 23, 2016
2016 BAFSA AGM and Conference in Cardiff AM Anne Jones visiting the IPS Demo Vehicle during the Recent BAFSA Conference...
- IPS Flow Systems
- November 22, 2016
Let Us Come To You Today sees the new IPS demo vehicle starting a tour of the south east to raise awareness of one of...
- IPS Flow Systems
- October 31, 2016
The economic solution for domestic wastewater disposal The Kessel Aqualift F Basic lifting station is the latest model...
- IPS Flow Systems
- October 19, 2016
Special Delivery IPS Flow Systems Dublin Branch has taken delivery of their purpose built Mercedes Pick-Up Truck. Mark...
- IPS Flow Systems
- October 16, 2016
Designed to perform and engineered to last – VIPSeal™ is a versatile range of flexible couplings and adaptors for...
- IPS Flow Systems
- October 5, 2016
Want a Visit from IPS? At IPS Flow Systems we have always provided our customers with full technical backup and...
- IPS Flow Systems
- September 25, 2016
Shower Drains for All Your Needs Lifestyle, relaxation, water, individuality are all themes that are integrated into...
- IPS Flow Systems
- September 21, 2016
Designed to perform and engineered to last VIPSeal™ is a versatile range of flexible couplings and adaptors for joining...
