Monthly Archives: April 2018

Welcome to the IPS Flow Systems blog. From here you can get the latest news and updates about our company and its product range.
  1. IPS Get Ready for Pump Centre Conference 2018

    Following our successful attendance at the Pump Centre Conference in 2017 IPS Flow Systems based in County Durham have been preparing to return in 2018 to share details on the KESSEL range of market leading lifting stations, hybrid stations and back water protection valves.
    Read more
  2. Sprinklers and Tower Blocks. A Time to Talk. A Time to Act.

    Fire broke out on the 14th of June 2017 at the 24-storey Grenfell Tower block of public housing flats in North Kensington. 71 died. 70 more were injured. Big picture discussions about what should have been done in the past and what to do in the future make the headlines. The public, quite rightly, want to get past the reviews and the unpicking as quickly as possible. They want action. This should never have happened and this must never happen again. Here at IPS we think similarly. Whilst we won’t get into any political aspect of this occurrence on this forum, we will agree wholeheartedly that this must not happen a
    Read more